description: Wondering how to overcome some of your Internet of Things security challenges? Here’s one strategy.
image: https://www.link-labs.com/hubfs/photo-1516387938699-a93567ec168e-1-1.jpeg.webp
---

[![link-labs-logo-radial-2](https://www.link-labs.com/hubfs/link-labs-logo-radial-2.svg "link-labs-logo-radial-2")](https://www.link-labs.com/)

[![link-labs-logo-radial-2](https://www.link-labs.com/hubfs/link-labs-logo-radial-2.svg "link-labs-logo-radial-2")](https://www.link-labs.com/)

**

[![Book a Demo](https://no-cache.hubspot.com/cta/default/427771/598eabc0-7dd8-4d20-87dc-95a6fe8622ab.png)](https://cta-redirect.hubspot.com/cta/redirect/427771/598eabc0-7dd8-4d20-87dc-95a6fe8622ab)

**

![How To Mitigate Internet Of Things Security Challenges In Development](https://www.link-labs.com/hubfs/photo-1516387938699-a93567ec168e-1-1.jpeg.webp)

# How To Mitigate Internet Of Things Security Challenges In Development

Published January 28, 2015

To paraphrase Henry Kissinger, “It is not often that [companies] learn from the past, even rarer that they draw the correct conclusions from it.” At Link Labs, we hope to break this trend when it comes to security in the Internet of Things (IoT). Most people are aware of the cyber security issues consumers and businesses face when it comes to the internet, cloud computing, electronic payments, mobile, and the myriad of other technologies. The reason that security is such a major issue in cyber computing is that measures were often considered only *after* launching a product or new technology. In short, [you can’t easily retrofit security](https://www.link-labs.com/the-2-hows-of-iot-security/).

**With that in mind, take a look at the Google Trends chart below.** This shows the popularity of search terms over time. As you can see in blue, “Internet of Things” has taken off as a search term… and it currently sits at its most popular point in Google history (as of January 2015). But check out the red line. That is how the search volume for “Internet of Things security” stacks up against “Internet of Things” in popularity over the same time period. I would not expect IoT security to approach IoT in terms of popularity, but I bet the relative magnitude might have had a different story to tell.

It’s a good visual of the prioritization going on in the IoT. Companies see a [$19 trillion opportunity](http://www.bloomberg.com/news/2014-01-08/cisco-ceo-pegs-internet-of-things-as-19-trillion-market.html), and they want to rush into development and often times security becomes a casualty of time-to market. Sound familiar? This is exactly why we’re seeing major breaches at [Home Depot and Target](http://www.forbes.com/sites/quickerbettertech/2014/09/22/why-the-home-depot-breach-is-worse-than-you-think/), and why the [IoT is susceptible to hacks](http://www.ibtimes.com/internet-things-very-susceptible-hacking-study-shows-1647924).

### **Plan For Your Internet Of Things Security Challenges**

Although it seems like we’re already down this path of no return as an industry, there is still hope. And it starts with you, your company, and the IoT application you’re building. You need to consider the Internet of Things security challenges you face before completely building out the technology. Here’s one way how. **The Risk Matrix For IoT Security** A risk matrix is a basic method in risk management that compares the probability of risk to the impact of that risk. If a certain risk is highly probable and also highly impactful, that issue becomes priority one. You need to focus on stopping that threat first.

[![risk-matrix-security-challenges](https://www.link-labs.com/hs-fs/hubfs/risk-matrix-security-challenges.webp?width=600&name=risk-matrix-security-challenges.webp)](https://www.link-labs.com/hubfs/Imported_Blog_Media/risk-matrix-security-challenges.gif)

**Source:** ruleworks.co.uk

 

A risk tolerance line can be established by your team in order to help you prioritize your IoT/M2M security challenges. If impact is medium but the probability is very low, that item may fall below your risk tolerance line and you will not focus on it. Obviously with an unlimited budget or an outside firm who can ensure security, you’ll be able to safely secure all access points to your system. That is ideal. By the way, we’d like to reiterate the fact that “risk tolerance” is not a dependent variable of “time-to-market.” But, if you’re going it alone, we recommend starting with the risk matrix process you see above. Here are some typical security issues that may be facing an IoT application:

- AES public/private key exchange methods
- Protecting attached TPC/IP networks from intrusion through your device
- Protecting pre-shared keys from reverse engineering through an MCU debugger

In summary, we recommend outlining all of the M2M security challenges facing your application. Then, chart them out on a risk matrix and prioritize your concerns. How well can you safely secure the top priorities and all following concerns? **[Drop us a line](https://info.link-labs.com/assessment)** if you’d like some help from a Link Labs engineer about your specific Internet of Things security challenges.

[![InPost-CTA-SelectingWirelessTechnology-2](https://www.link-labs.com/hs-fs/hubfs/InPost-CTA-SelectingWirelessTechnology-2.webp?width=1325&name=InPost-CTA-SelectingWirelessTechnology-2.webp)](https://www.link-labs.com/selecting-wireless-technology-for-iiot-products)

Share Article:

- [LinkedIn](http://www.linkedin.com/shareArticle?mini=true&url=https%3A%2F%2Fwww.link-labs.com%2Fblog%2Finternet-of-things-security-challenges&title=How%20To%20Mitigate%20Internet%20Of%20Things%20Security%20Challenges%20In%20Development&source=leadquizzes.com)
- [Twitter](http://twitter.com/home?status=How%20To%20Mitigate%20Internet%20Of%20Things%20Security%20Challenges%20In%20Development+https%3A%2F%2Fwww.link-labs.com%2Fblog%2Finternet-of-things-security-challenges)
- [Facebook](http://www.facebook.com/share.php?u=https%3A%2F%2Fwww.link-labs.com%2Fblog%2Finternet-of-things-security-challenges&title=How%20To%20Mitigate%20Internet%20Of%20Things%20Security%20Challenges%20In%20Development)

![Jennifer Halstead](https://www.link-labs.com/hubfs/Untitled%20design%20(2).png)

[LinkedIn](https://www.linkedin.com/in/jennifer-halstead-925913196/)

### Written by [Jennifer Halstead](https://www.link-labs.com/blog/author/jennifer-halstead)

Jennifer Halstead, MBA, CPA brings more than 20 years industry experience to Link Labs. She began her career in finance within the pharmaceutical industry and has continued in both public accounting and private companies. She passed the CPA exam with the 3rd highest score in the state and completed her MBA with an accounting concentration (summa cum laude). Jennifer has worked with several software companies and has led multiple venture financing, merger and acquisitions deals. She has helped companies expand internationally and has managed the finance department of a startup to 33 consecutive quarters of growth prior to acquisition. After the acquisition, she served as the Controller of Dell Software Group’s Data Protection Division where she managed a portfolio of multiple hardware and software products to scale and achieve over triple-digit growth worldwide in 18 months. Jennifer brings a depth of experience and leadership to the Link Labs team.

## Related Blogs

<https://www.link-labs.com/blog/link-labs-12-years-of-innovation-in-tracking-and-logistics>

 Asset Tracking, BLE Asset Management Bluetooth Low Energy, Featured, Asset Tracking, supply chain, Bluetooth LE, equipment tracking, iot solutions, iot technology, Real-time location services, Asset Tracking Solutions, supply chain operations, supply chain visibility tools, end to end supply chain

## [Link Labs: 12 Years of Innovation in Tracking and Logistics](https://www.link-labs.com/blog/link-labs-12-years-of-innovation-in-tracking-and-logistics)

[Read](https://www.link-labs.com/blog/link-labs-12-years-of-innovation-in-tracking-and-logistics)

<https://www.link-labs.com/blog/national-supply-chain-day-how-link-labs-is-transforming-visibility-from-warehouse-to-world>

 Asset Tracking, BLE Asset Management Bluetooth Low Energy, Asset Tracking, supply chain, Bluetooth LE, equipment tracking, iot solutions, iot technology, Real-time location services, Asset Tracking Solutions, supply chain operations, supply chain visibility tools, end to end supply chain

## [National Supply Chain Day: How Link Labs Is Transforming Visibility from Warehouse to World](https://www.link-labs.com/blog/national-supply-chain-day-how-link-labs-is-transforming-visibility-from-warehouse-to-world)

[Read](https://www.link-labs.com/blog/national-supply-chain-day-how-link-labs-is-transforming-visibility-from-warehouse-to-world)

<https://www.link-labs.com/blog/never-lose-track-of-medical-equipment>

 Asset Tracking, BLE Asset Management Bluetooth Low Energy, Asset Tracking, Bluetooth LE, equipment tracking, iot solutions, iot technology, Real-time location services, Healthcare Asset Tracking, Healthcare RTLS, Healthcare Logistics, Asset Tracking Solutions

## [Never Lose Track of Medical Equipment Again](https://www.link-labs.com/blog/never-lose-track-of-medical-equipment)

[Read](https://www.link-labs.com/blog/never-lose-track-of-medical-equipment)

Subscribe to Link Labs' blog weekly update!

[![Subscribe](https://no-cache.hubspot.com/cta/default/427771/ed585289-5734-4d07-9ce4-f9cc32d50874.png)](https://cta-redirect.hubspot.com/cta/redirect/427771/ed585289-5734-4d07-9ce4-f9cc32d50874)

![](https://cdn2.hubspot.net/hubfs/2285307/close-video-btn.svg)

#### Subscribe to Link Labs' blog weekly update!

```json
{
  "@context" : "https://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Jennifer Halstead",
    "url" : "https://www.link-labs.com/blog/author/jennifer-halstead"
  },
  "dateModified" : "2022-02-08T21:10:27.649Z",
  "datePublished" : "2015-01-28T14:23:00.000Z",
  "headline" : "How To Mitigate Internet Of Things Security Challenges In Development | Blog | Link Labs",
  "image" : [ "https://www.link-labs.com/hubfs/photo-1516387938699-a93567ec168e-1-1.jpeg.webp" ],
  "mainEntityOfPage" : {
    "@id" : "https://www.link-labs.com/blog/internet-of-things-security-challenges",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "url" : "https://www.link-labs.com/hubfs/Logo-1.png"
    },
    "name" : "Link Labs"
  }
}
```